What We Do

Services

Every job we quote breaks down into one of these.

Home › Services

Everything we take on

Every job below is one we do ourselves across Paterson.

Deck Installation

We frame new decks from the footings up, with posts set below the frost line so the structure doesn't shift in winter. Joists get hung on galvanized or stainless hangers sized to the span, not just nailed through the face.

Custom Deck Design

Multi-level decks, built-in benches, pergolas over part of the deck, stairs that land where your yard actually slopes down to. We draw it out and size the framing before a single post goes in the ground.

Composite Decking Installation

Composite boards don't need staining and won't splinter, but they still need a framing system built to the manufacturer's span tables, which are tighter than standard lumber spacing. We follow those specs so the warranty on the boards stays valid.

Deck Repair

Soft spots, bouncy sections and rotted boards usually point to a joist that's taken on water. We replace the bad lumber and check the hangers and flashing around it instead of just patching the surface.

Deck Railing Repair & Installation

A railing with play in it usually means the post is lag-bolted into rim joist that's starting to split, not just a loose baluster. Code around here calls for 36-inch height and baluster spacing under 4 inches, and we build to that whether it's new work or a repair.

Deck Staining & Sealing

UV and standing water are what actually kill a deck surface, not foot traffic. We power wash, let the wood dry out fully, then apply a penetrating stain or sealer, usually a two to three day process depending on weather.

Deck Resurfacing & Board Replacement

If the frame underneath is still sound, we can pull the old decking and lay new boards on the existing joists instead of rebuilding the whole structure. It's a cheaper way to get a new surface when the problem is really just the boards.

Deck Framing & Joist Repair

This is the part of the deck nobody sees until it fails, the joists, the ledger board, the beam. We re-flash ledger connections, swap corroded hangers, and sister new lumber alongside joists that have started to crack or sag.

Deck Demolition & Removal

Old decks come down board by board where we can reuse the posts or footings, and get hauled off site when they can't. We check what's salvageable before quoting a full rebuild, since footings in good shape save you money.

Screened Porch & Deck Additions

Some clients want part of the deck screened in or roofed over to get a few more months of use out of it each year. That's a different load path than open decking, so we size the framing for it from the start, not after.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Paterson, NJ

Deck installation and repair work covers Paterson and roughly a 50-mile radius.

Paterson, NJ
Newark, NJ
Jersey City, NJ
Elizabeth, NJ
Clifton, NJ
Passaic, NJ
Union City, NJ
Bayonne, NJ
East Orange, NJ
Wayne, NJ
Hackensack, NJ
Teaneck, NJ
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck in New Jersey?
Most New Jersey townships require a building permit for any deck over 30 inches above grade, and many require one regardless of height if it's attached to the house. The permit process includes a footing inspection before decking goes on and a final inspection once railings are installed.
How long does a typical deck installation take?
A standard single-level deck, roughly 300 to 400 square feet, usually takes 5 to 10 working days from footings to finished railing, weather permitting. Multi-level decks or ones with a roof or screened section take longer, often two to three weeks.
Can a deck be built to a set budget?
Decking material is the easiest place to adjust a budget, since pressure-treated lumber costs significantly less than composite or cedar per square foot. Simplifying railing style or stair layout is the next place to trim cost without touching the structure underneath.
Is there a warranty on deck construction work?
Workmanship warranties on deck construction typically run one to five years depending on the contractor, separate from manufacturer warranties on composite decking material, which often run 25 to 50 years against staining and fading. Ask for both warranties in writing before the job starts.
Who do I deal with day to day during the project?
On most deck jobs, one person runs the crew on site and is the point of contact for questions about schedule or changes, rather than the job bouncing between different people. That contact should be reachable by phone throughout the build, not just at the start and end.
What decking materials are available?
Options include pressure-treated pine, which is the least expensive and needs staining every two to three years; cedar, which has a nicer grain but still needs maintenance; and composite boards like Trex or TimberTech, which cost more upfront but need no staining. PVC decking is also available for fully synthetic, low-maintenance builds.
Can I still use my yard or house during construction?
The house itself isn't affected by deck construction since the work happens outside, though the immediate yard area around the build will be a job site with tools, lumber and some noise during work hours. Access to the yard is usually restricted near the structure until framing is complete and it's safe to walk under.
How should I prepare the site before work starts?
Clearing furniture, grills and planters off the old deck or the build area, and moving vehicles away from the driveway for material drop-off, is usually all that's needed beforehand. Marking the location of any buried sprinkler lines or dog fence wires in the work area helps avoid damaging them during footing excavation.
What happens if something unexpected turns up once the old deck comes down?
Rotted rim joists, a ledger board attached without flashing, or a sistered beam hidden under old decking are common finds once demolition starts. These get flagged before new framing goes in, with any added cost explained and approved before the work continues.
How should a new deck be maintained?
Pressure-treated and cedar decking should be cleaned and resealed every two to three years to prevent graying and cracking, with gaps between boards kept clear of leaves and debris that trap moisture. Composite decking just needs occasional washing with soap and water, no staining required, but boards should still be checked yearly for loose fasteners.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (908) 860-9801