
We build and repair decks around Paterson, mostly for homeowners who want someplace to sit outside that isn't a slab of old concrete or a deck that's started to sag. Most of us got into this trade through framing or general carpentry and ended up specializing because decks are their own animal, half structure and half furniture. We still do the structural half the same way we'd frame a floor, because that's what a deck actually is.
If you're on this page, there's a decent chance a board's gone soft, a railing's got some play in it, or the whole thing just doesn't feel as solid as it used to. Usually that traces back to one of three things: the ledger board pulling away from the house, joist hangers that rusted out, or footings that were never poured deep enough to begin with. We find which one it is before we touch a board, then fix the cause instead of just swapping the piece that's obviously broken.
None of this is complicated. It is mostly just doing what we said we would do.
If a ladder dings your siding or a post hole nicks a gas line, that's on our policy, not yours. Ask for certificates before any contractor sets foot on your property.
Most towns around Paterson require a permit for anything over 30 inches off the ground, and skipping that step can cost you at resale. We handle the paperwork and the inspector walk-through so you don't have to.
Deck demo throws nails and blade-cut lumber all over a yard, and that stuff doesn't belong where your kids or dog walk. We run a magnetic sweep before we call a job finished.
The quote breaks out framing, decking material, railing and labor separately, so you can see where the money's going. No surprise line items once the posts are set.
Deck work moves fast when the ground's dry and stalls when it isn't, and we'll tell you which one it is instead of guessing. You'll know your start date and roughly how many days we need before we touch a shovel.
We'll lay out actual boards so you can see the grain and the color before you commit, not just a sample chip. What you pick changes the fastener pattern and the maintenance schedule, and we'll explain both.
Questions about who you'd actually be hiring.
Free estimate, a price in writing, and work we stand behind.